MOWBRAY PARK PONTOON REPLACEMENT

The Mowbray Park Steel Pontoon is situated on the Brisbane River and is available to the public. The project involved replacing the original steel pontoon with a like for like steel pontoon.
MLEI Consulting Services (trading as Esen Engineering at the time) delivered the engineering design for:
- Steel pontoon
- Steel restraint piles
- Aluminium handrails.
We undertook inspections and certifications to these standards:
- AS1170.1 – Structural Design Actions – Dead and live loads
- AS1170.2 – Structural Design Actions – Wind
- AS1664.1 – Aluminium Structures Code
- AS2159 – Piling Code
- AS 3600 – Concrete Structures Code
- AS4100 – Steel Structures Codes
- AS4997 – Guidelines for the Design of Maritime Structures.