ORORA DANDENONG PROCESS WAREHOUSE

MLEI undertook the structural and civil design for the Orora Glass Future Coil building project comprising 3,000m² warehouse, 300m² canopy, loading docks and external concrete hardstand area.
Our services included:
- Structural engineering
Design of footings and superstructures, engineering calculation report, structural specifications, check structural steel and precast panel shop drawings, coordination with services consultants. - Civil engineering
Siteworks, drainage plan, stormwater drainage calculations, detention calculations, detailed civil and stormwater design, pavement design for concrete pavements, construction drawings, technical specifications. - Construction phase
Respond to RFIs, site inspections.