WARLOCH REST AREA & STUART HIGHWAY INTERSECTION UPGRADE

This project aimed to improve the safety and accessibility of the two existing accesses to the Warloch Rest Area along the Stuart Highway and make the site more appealing to use as a rest break for road users. MLEI was engaged to deliver detailed geometric design and the preparation of drawings and tender documentation, including:
• Temporary works including detours and access tracks
• Pavement design
• Intersection design
• Street lighting design
• Quantity and cost estimations
• Technical specification.