WEILONG WINERY

Popup_Weilong

LOCATION
Red Cliffs, VIC
CLIENT
Weilong Winery c/o Linney Engineering Services
DESCRIPTION
Various buildings
PROJECT PERIOD
2018-2020
PROJECT VALUE
$80M

Before MLEI acquired Linney Engineering Services, we worked together on the new Weilong winemaking facility. Linney Engineering was responsible for the overall project delivery including master planning, project management, design, design management, procurement and construction management. MLEI undertook the structural engineering design for various components and areas for this new wine making facility.

MLEI’s project scope involved the following buildings:
• Filtration Building – a large building with many areas within the building including Centrifuge, Flotation, storage, cool room. It consisted of precast load-bearing walls and structural steel roof.
• Crushing Area – a multi-level area consisted of bins, cranes, drive through deck and crushers. The lower level is 4m under the ground and contains the crushers.
• Plantroom Building – a multi-level building contained ground floor pumping rooms and large condensers above on L1.
• Output Filtration Building – a single-storey building used for the wine cross over and boiling room.