SEAVIEW HIGH SCHOOL REDEVELOPMENT

LOCATION Seacombe Heights, SA
CLIENT Department for Infrastructure & Transport c/o Flight Path Architects
DESCRIPTION Design and construction of new buildings and carpark
PROJECT PERIOD 2019–2021
PROJECT VALUE $15.7M
MLEI undertook the structural and civil engineering for the design and construction of two new buildings at Seaview High School – Creative Design building and Performing Arts building.
The design included:
- Structural and civil design of new Creative Design double-storey building
- Structural and civil design of new Performing Arts building
- Structural design of refurbishment of existing building – General Learning Hub
- Structural and civil design of tennis court and retaining walls
- Stormwater analysis of school network
- Civil design of both a temporary and permanent parking area
- Integration of civil design into landscape architectural elements.