ZEISS OFFICE AT TONSLEY MAB

LOCATION Tonsley Innovation District, SA
CLIENT John Koutsoukou
DESCRIPTION New office and laboratory
PROJECT PERIOD 2021‐2022
PROJECT VALUE $6M
MLEI undertook the structural engineering design for Zeiss’ massive new 4000m 2 facility in the Tonsley MAB (formerly the Main Assembly Building Mitsubishi Motors). These premises contain 120 Zeiss staff relocated from Lonsdale, and featured the Australian sales and service centre, a prescription laboratory, R&D team for vision care.
MLEI’s project scope included:
- Assessment of existing slab and the below-slab tunnels frame to withstand the new building loads
- Detailed design of suspended floors over existing pits
- Detailed design of the superstructure including all columns, beams, lateral stability, roofing members, mezzanine level and any steel framing elements.