CLEANAWAY MATERIAL RECOVERY FACILITY

LOCATION Coolaroo VIC
CLIENT FIMMA Constructions
DESCRIPTION Recycling warehouse
PROJECT PERIOD 2022-2023
MLEI undertook the structural and civil design for the Cleanaway building works comprising new bunker walls, sprinkler tank, pumphouse slab, 26-space carpark.
Our services included:
- **Structural engineering **
- Structural design of bunker walls and footings
- Review existing structure to support proposed sprinkler system
- Engineering calculation report and relevant structural specifications
- CAD drawings
- Internal certification and issue of regulation 126 form
- Coordination with services consultants. - **_Civil engineering
_ ** - Detailed stormwater drainage calculations
- Detailed civil and stormwater design
- Full construction drawings and technical specifications. - **_Construction
_ ** - Respond to RFIs
- Site inspections.