LIEBHERR PROJECTS

Popup Liebherr

LOCATION Para Hills, SA and Mount Thorley, NSW
CLIENT Liebherr
DESCRIPTION Commercial Facility Upgrade
PROJECT PERIOD 2012-2015
PROJECT VALUE $95M (SA) $14M (NSW)

MLEI partnered with Darengineer to complete the civil and structural engineering design for the $95M development to Liebherr’s Adelaide facility and a $14M extension to their facility at Mount Thorley, NSW. The projects included multi-storey office buildings, substantial warehouses, cranes, industrial pavements and large civil works including stormwater treatment facilities.

The structural engineering consisted of providing highly technical solutions with a collaborative approach with the client to ensure the sensitive operation of their production work would be achieved. The major structural design elements include steel framing, precast panels, post-tensioning slabs and Bondek slabs.

SA Facility:

WSUD was the main driver of the civil engineering design. Bio-retention swales have been included to the staff parking areas. A large grassed dry land swale was included along the western boundary of the site before discharging in an open cut detention pond. The flows are then restricted before discharging into Main North Road. Further water in other sealed areas are drained through gross pollutant traps before being discharged into the Council stormwater system.

NSW Facility:

The Mount Thorley site was driven by providing treatment to the stormwater before being discharged into a natural water course. Underground treatment systems are utilised before the water is discharged into a rock gabion detention pond. Through utilising eWater Music, MLEI demonstrated that the efficiency of the overall system in reducing the pollutant levels in the stormwater.