RI INDUSTRIES PROCESSING WAREHOUSE

LOCATION 24-30 Davis Street, Wingfield SA
CLIENT Sagle Constructions
DESCRIPTION Warehouse and offices
PROJECT PERIOD 2024-2025
MLEI undertook the structural and civil design for RI Industries’ new warehouse, which included 3000m 2 structural steel shed 25m wide x 120m long, concrete hardstand, steel framing supports for 32T and 16T overhead gantry cranes, new offices & lunchroom, and carpark for 50+ spaces.
Our services included:
- **Structural engineering **
- Concept design, preliminary design, detailed design and construction services
- Structural design of footings and superstructure
- Coordination with services consultants. - **_Civil engineering
_ ** - Detailed stormwater drainage calculations
- Detailed civil and stormwater design. - **_Construction
_ ** - Checking structural steel & precast panel shop drawings for structural compliance
- Responding to RFIs
- Site inspections.