JURLIQUE HEAD OFFICE & MANUFACTURING WAREHOUSE

LOCATION Mount Barker, SA
CLIENT Jurlique International c/o Brown Falconer Architects
DESCRIPTION New warehouse, office and production facility
PROJECT PERIOD 2015-2017
PROJECT VALUE $15M
MLEI were engaged to complete the civil and structural engineering for the new $14M Jurlique International office, production facility and warehouse located in Mount Barker.
The production facility included all the equipment and process to produce cosmetics. The design was undertaken within the requirements of TGA and included mixing rooms, testing rooms, laboratories, chemical storage and packaging.
The structural engineering included the design of footings, retaining walls, concrete slab, concrete ramps, the steel roof framing and canopies and the design of precast panels. MLEI were involved in finalising the site works including pavements and developing a stormwater drainage plan. We also prepared civil/structural drawings and relevant technical specifications for tender and construction purposes.