AAL Airside
Projects  /
Buildings

AAL Airside

South Australia

Project Overview

Supporting Adelaide Airport's Future Freight and Logistics Growth.

AAL Airside is the proposed first stage of Adelaide Airport Limited's 28.6-hectare Airport Junction Precinct, supporting long-term freight and logistics growth through purpose-built cargo facilities. The development comprises two airside-fronting warehouses of approximately 5,000 m² and 5,500 m², with attached single-storey offices and extensive landside and airside hardstands for heavy vehicle operations. The design scope progressed to 30% documentation, including drawings, design reports and Principal's Project Requirements to support future Design and Construct procurement.

‍

Key Project Elements:

‍

  • 30% concept civil and structural design for both warehouse development sites
  • Structural design of foundations, warehouse framing and office structures
  • Civil design covering site levels, stormwater drainage, retaining walls and pavements
  • Concept sketches to support quantity surveying and high-level cost planning
  • Civil and structural input into the Principal's Project Requirements (PPR) document
  • Design coordination, stakeholder engagement and collaboration with the wider consultant team

‍

Design Challenges

‍

  • Soft ground conditions requiring assessment of piled foundations against significant site preparation and ground improvement works
  • Ongoing precinct stormwater design and construction requiring coordination with the development's civil designers
  • Unconfirmed tenant layouts and requirements at concept stage, requiring flexible design options to accommodate future development

‍

Approach

‍

  • Assessed conventional and fibre-reinforced pavement slab options to inform costing and selection during future design stages
  • Reviewed piled foundation and site preparation options in collaboration with the geotechnical consultant and Quantity Surveyor
  • Coordinated with the precinct civil designers to align the warehouse site design with ongoing stormwater infrastructure planning

‍

Outcomes

‍

  • Identified site preparation and reworking of the existing soft soils as the preferred foundation approach, following geotechnical consultation, cost review and consideration of the broader site
  • Developed pavement construction options for further cost assessment during subsequent project stages

Project Info

Client

BELL Architecture

Duration

2025 - Current

Capabilities

Civil Engineering

Structural Engineering

Market Sector

Buildings

Sub-Sector

Industrial Warehouse

Discover more and download our capability statement