Hans Heysen Art Gallery
Projects  /
Buildings

Hans Heysen Art Gallery

South Australia

Project Overview

The new Heysen Gallery at The Cedars provides a purpose-built cultural facility celebrating and preserving the artistic legacy of renowned Australian artists Sir Hans Heysen and Nora Heysen. Set within the historic Adelaide Hills property, the gallery includes dedicated exhibition spaces, environmentally controlled collection storage, retail and workshop areas.

The low-profile contemporary building responds to the surrounding landscape and heritage setting. Feature timber façade elements form an important part of the architectural expression, connecting the building with the mature vegetation and natural material palette of The Cedars.

Key project elements

MLEI provided detailed civil and structural engineering design, working closely with the architect and wider consultant team to develop coordinated engineering solutions that supported the architectural intent.

The structural design responded to the gallery’s distinctive built form and functional requirements as a contemporary gallery and archival facility. This included the integration and structural support of the feature timber façade elements and associated architectural detailing.

Civil engineering addressed the integration of the new building within the established site, including coordination of site levels, stormwater drainage and associated external works.

During construction, we worked closely with the project team to resolve engineering and coordination matters as they arose, supporting delivery of the structural and civil design and the broader architectural intent.

Project significance

The project demonstrates our experience delivering integrated civil and structural engineering for architecturally significant cultural facilities. It required close coordination between structural systems, feature façade elements and architectural detailing, together with considered civil design within a sensitive heritage and landscape setting.

Project Info

Client

Hans Heysen Foundation c/o Snohetta

Duration

2020 - 2026

Value

$9M

Capabilities

Civil Engineering

Structural Engineering

Market Sector

Buildings

Sub-Sector

Commercial

Discover more and download our capability statement

Thanks! Our Capability Statement should now open in a new tab. If it doesn’t, please check your browser’s pop-up settings and try again.
Oops! Something went wrong while submitting the form.