Jurlique Head Office + Manufacturing Warehouse
Projects  /
Resources + Industrial

Jurlique Head Office + Manufacturing Warehouse

South Australia

Project Overview

The Jurlique International facility in Mount Barker was developed to support the manufacture, testing and packaging of cosmetic products within Therapeutic Goods Administration requirements. The $15 million project created a purpose-built office, production and warehouse facility for specialised cosmetic production.

Key Project Elements

Production and testing spaces

  • Mixing rooms
  • Laboratories
  • Testing rooms
  • Chemical storage
  • Packaging areas

Structural engineering

  • Footings and retaining walls
  • Concrete slabs and ramps
  • Steel roof framing
  • Canopies and precast panels

Civil engineering

  • Site civil works
  • Stormwater drainage
  • Documentation and technical specifications for tender and construction

The facility required practical engineering for a controlled production environment, with the design supporting manufacturing workflows, testing requirements and long-term operational use.

Project Info

Client

Jurlique International c/o Brown Falconer Architects

Duration

2015 - 2018

Value

$15M

Capabilities

Civil Engineering

Structural Engineering

Market Sector

Resources + Industrial

Sub-Sector

Process Facilities

Discover more and download our capability statement

Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.