Napa Napa Oil Refinery
Papua New Guinea
Project Overview
Napa Napa Oil Refinery was the first refinery built in Papua New Guinea. The marine facility supported the import of crude oil and export of finished product, servicing both domestic supply and international markets.
Key Project Elements
Large Berth
- Designed for vessels up to 110,000 DWT
- Four berthing dolphins
- Four mooring dolphins
- 12m wide x 31m long loading platform
- 80m long access trestle connected to the causeway
Small Berth
- Designed for vessels up to 18,000 DWT
- Four mooring dolphins
- 12m wide x 39m long loading platform
- 28m long access trestle connected to the causeway
Construction Approach
- Extensive use of precast concrete to simplify construction over water
- 129 driven piles
- Cast-in steel plates within precast units, allowing the superstructure to be welded to the steel piles
The project demonstrates specialist marine engineering capability across berth structures, dolphins, loading platforms, access trestles, driven piles and precast construction methods for complex over-water infrastructure.