Port Hedland Tug Harbour
Western Australia
Project Overview
Developed to expand towage capacity at Port Hedland, the Port Hedland Tug Harbour supports the safe movement of vessels while reducing the risk of channel blockage as iron ore export operations continue to grow. MLEI, trading as Madsen Giersing (MG) at the time, was engaged by Lendlease to deliver the detailed design and construction phase technical support for the project's marine structures and coastal protection works.
Key Project Elements
- Detailed design of marine structures
- Technical support during construction
- Excavation of a new harbour within the existing dredge material management area
- Construction of 4 pontoons providing cyclone; berths for up to 8 new RAstar 85 Escort tugs (1065ft displacement)
- A fifth pontoon providing 4 berths for small boats
- Piled seawalls either side of the entrance channel to reduce cyclone wave penetration
- Rock armour coastal protection
- Two service pontoons at Nelson Point
- Davit crane capable of lifting 3.6t at 12.5m radius
- Mooring, navigation + access infrastructure
The completed harbour provides cyclone-protected berthing, expanded towage facilities and upgraded support infrastructure, strengthening the safe and efficient operation of one of the world's busiest bulk export ports.
Project Info
Client
BHP
Duration
2016
Value
$96m