Seaford Village Shopping Centre
Projects  /
Buildings

Seaford Village Shopping Centre

South Australia

Project Overview

Delivering a New Retail and Supermarket Precinct for Seaford Village

The proposed Seaford Village Shopping Centre development comprised a 3,600m² supermarket, five retail tenancies totalling approximately 2,200m² and a 985m² mezzanine office above the supermarket.

The development also included a 310-space car park, rear loading dock, click-and-collect bays, and associated foyer, amenities and circulation areas. An extension to Tiffany Street was also planned to support access to the centre.

‍

Key Project Elements:

‍

  • Planning application support
  • Civil siteworks and stormwater management plan
  • Detailed stormwater drainage modelling using DRAINS
  • Stormwater quality treatment modelling and design using MUSIC
  • 2D bulk earthworks planning
  • Stormwater Management Report update
  • Stormwater management site plan for Planning Approval submission
  • Reviewed flood mapping and undertook site investigations to determine flood risk to development given proximity to water course and wetland
  • Provided overland flow paths around building to manage potential floodwaters from creek
  • Undertook intrusive investigation to verify existing Council pipe alignments and confirm development discharge strategy
  • Liaised closely with City of Onkaparinga to satisfy Planning Approval conditions to support the development
  • Civil design undertaken to Principals Project Requirements to support end Client

‍

Project Info

Client

Lofty Property Group

Duration

2025 - 2026

Value

$18M

Capabilities

Civil Engineering

Market Sector

Buildings

Sub-Sector

Retail

Discover more and download our capability statement

Thanks! Our Capability Statement should now open in a new tab. If it doesn’t, please check your browser’s pop-up settings and try again.
Oops! Something went wrong while submitting the form.