
Weilong Winery
Victoria
Project Overview
The Weilong winemaking facility was developed as a purpose-built production complex to support modern wine processing, storage and plant operations. The facility required practical structural design across several specialist industrial areas, each with different operational and loading requirements.
Key Project Elements
Production Buildings
- Filtration Building
- Crushing Area
- Plantroom Building
- Output Filtration Building
Structural Engineering
- Multi-level processing areas
- Below-ground structures
- Load-bearing precast construction
- Structural steel-framed buildings
The project required a clear understanding of winery operations, equipment loads, access requirements and construction sequencing. The structural design supported a functional production environment, with practical solutions tailored to the demands of industrial wine processing.
Project Info
Client
Weilong Winery
Duration
2018 - 2020
Value
$80M
Capabilities
Market Sector
Sub-Sector




.png)
.png)
.png)